It was turned off at 07:20 in the morning.

The outage is linked to damage to a section of the heating network managed by the enterprise "Zhyllyo". Due to an increase in system replenishment, it became necessary to carry out work to locate and eliminate the damage, reports "Minskenergo".
Temporarily left without heat supply are: 175 residential buildings, 16 educational institutions, three healthcare facilities, as well as a social service center for the population.
Shutting off the heating main is a necessary measure to enable the repair of the damage on the section managed by this enterprise, Minskenergo reported.
Repair work is scheduled until 23:59.
Now reading
"Worked in long-haul trucking for more than 20 years." What is known about the truck driver killed in a terrible accident on Saturday near Staryya Darohi?
Comments