Radiation background in the station area is unchanged.

Photo: BelNPP
On April 27, power unit No. 1 was disconnected from the grid to carry out preventive maintenance on the equipment.
The radiation background in the station area is unchanged, BelNPP reported in its Telegram channel.
It is reported that the work is being carried out to ensure the reliable operation of the power unit.
-
Italy's Chargé d'affaires ad interim to Belarus Changes
-
"Set up tents, lit bonfires." The Ministry of Internal Affairs confirmed the detention of 350 people near Rasony. They also found an argument: "Many were naked in front of minors"
-
Sheiman Found to Have Another Possible Mistress and Son. A Secretary Without Higher Education Became the Owner of Luxury Homes and a Shopping Center in a Few Years
Now reading
Sheiman Found to Have Another Possible Mistress and Son. A Secretary Without Higher Education Became the Owner of Luxury Homes and a Shopping Center in a Few Years
Sheiman Found to Have Another Possible Mistress and Son. A Secretary Without Higher Education Became the Owner of Luxury Homes and a Shopping Center in a Few Years
"What, should I kill Tsikhanouskaya's children to draw attention to my problem?" How a stupid comment by activist Dzianis Dashkevich created problems for him in Poland
Comments
Из какого говна и палок её слепили ?
Беларусь пазбаўлена знешняга маніторынга, на маю думку, бо інакш Белгідрамет не аддаваў бы свайго супрацоўніка на Астравецкую АЭС, проста таму, што АЭС дала кватэру і годны заробак.