The bridge over Chyzhouka Reservoir will extend Malinin Street towards Loshytsa. Another overpass is planned to be built in the area of Syarova and Paval Shpilewski Streets.

The plans were revealed by Siarhiej Panioŭ, director of "Hardarbud", to "Minsk-News".
The overpass in the area of Syarova and Paval Shpilewski Streets will pass over the railway. The project envisages extending the southern highway through Asanaliyeva Street and constructing a full-fledged intersection. It will also be necessary to reconstruct the access roads to the industrial zone where "Rybakompleks", "Keramin", and "Kleon" combine are located.
The bridge over Chyzhouka Reservoir will allow extending Malinin Street towards Loshytsa.
Separate plans concern "Paŭnočny Bierah" (Northern Shore). Shirokaya Street is planned to be extended from Zialony Luh to the new micro-district. First, they plan to start design work, and then — construction.
Additionally, the possibility of designing and constructing two interchanges on the Minsk Ring Road (MKAD) — as an extension of Karastayanava and Navavilenskaya Streets — is being considered.
Exact construction dates are not specified.
Now reading
Belarusian warehouseman with a swastika on his shoulder was treated for alcoholism in Siberia and went to fight for Russia, but was left without payments or work
Comments
Smart!