Minsk CHP-4 is carrying out start-up operations on the main equipment from September 9 to 11. This is necessary for planned preparation for the heating season.

Photo: t.me/minskenergo
During such works, the readiness of the equipment for high loads is checked, as well as the ability of the CHP to continuously supply the city with heat and electricity.
"Minskenergo" warned that an increased noise level is possible during the works. The enterprise apologized to the residents of the city. The works will be carried out mainly during the daytime.
-
Minsk Woman Gets a Cute Rooster Instead of a Dog, Walks with Him Around the City, and Visits Cafes
-
"Children found out in the very first week, they just saw an advertisement." How a model teaches lessons at school
-
Kalesnikava: Europe's openness to Belarus and Belarusians, not to the regime, can reduce Russia's influence
Now reading
"If I were an investigator for the KGB, I would highlight the very same thing." Fiaduta on the hidden meanings of "The Ears of Rye Beneath Your Sickle," the security forces' attention to his manuscript, and the enigma of the third part of Karatkevich's novel
Comments