On the third day, the repair of the damaged section of the heating pipeline on Mikrarayon Sozh street was completed in the city. As reported by the Telegram channel «Krichev news», utility services worked all night, and around 8 AM on December 13, they began filling the heating system with water.

Photo: t.me/krichevsmi
Residents were informed that if the radiators do not become warm by 3 PM, they need to contact UKPP «Kommunalnik» to release air from the system.
Previously, due to a malfunction of the city boiler house «Sozh», recorded on December 10 at around 4:30 PM, 62 multi-apartment buildings, a school, and three kindergartens in Krychaw were left without heating. On the night of December 12, one booster pump was successfully connected, thanks to which heat was returned to 14 houses (504 apartments) and two kindergartens.
On the evening of December 12, Chairman of the Krychaw District Executive Committee Aliaksei Sharai reported that among social facilities, School No. 3 and one kindergarten still remained without heating.
Comments