On September 18 and 21, commissioning works are scheduled on the main equipment of Minsk CHPP-4. During these works, an increase in noise level is possible, "Minskenergo" reported.

The works are carried out as part of the preparation of the capital's energy infrastructure for the autumn-winter period. Specialists will check the readiness of the equipment for high loads and the station's ability to uninterruptedly supply consumers with heat and electricity throughout the heating season.
The main equipment and control systems will also be checked. This will allow for early detection of possible hidden defects and technical deviations, as well as checking the operation of protection and interlocking systems.
Since additional noise may occur during technical operations, the works are scheduled mainly for daytime.
-
"Threatened to go to another". The Ministry of Internal Affairs revealed details of the murder of a 43-year-old pregnant woman by a hockey referee
-
Remember the guy who reprimanded a tourist for a cigarette butt in the center of Minsk? Now he himself spent a night in a police station
-
Former Head of Gantsevichi Police Escapes from Psychiatric Hospital
Now reading
«If you work at home, you have nothing to live for, and if you work in a truck, you have no time to live». Belarusian long-haul drivers spoke about their lifestyle
«If you work at home, you have nothing to live for, and if you work in a truck, you have no time to live». Belarusian long-haul drivers spoke about their lifestyle
A young Belarusian didn't want to serve time in Russia for drugs, so he figured out how to quickly get out of the colony — and ended up on Ukrainian positions near Pokrovsk
Comments